V-25

100% Solids Variable Vapor Mitigation System

V-25 is a 2-component 100% solids, low viscosity epoxy system. It is capable of reducing  moisture vapor emission (MVER) from 10, 15, or 25 lbs. down to less than 3 lbs. per ASTM F-1869 (depending on application rate)

Leveling or patching compounds installed over V-25 do not require a primer if applied within 5 to 48 hours. Adhesives approved for use over non porous substrates can also be applied directly over V-25 within a minimum of 5 hours and up to a maximum of 5 days.

Product Features

  • Single coat, no primer required
  • Does not require sand broadcast
  • Variable vapor reduction by application thickness
  • Can receive coatings or flooring in as little as 5 hours
  • Can be used interior or exterior
  • Works on both moist and 5 day old “Green” concrete
  • Serves as underlayment primer (if applied within 48 hours)
  • Can also be left as “stand-alone” epoxy coating
  • Alkalinity protection pH 14
  • Contributes up to 1 LEED® Point: MR 2.1

Project Estimator

Square Feet:

  1. Lbs per 1000 sqft:

  2. < 10 lbs
  3. < 15 lbs
  4. < 25 lbs
  1. Gallons:

Disclaimer: Project estimator is calculated by amount of square footage entered and divided by coverage listed on datasheet. However, Vapor application rates are based on a number of factors including Below or Above Grade, types of testing taken, temperature and several others. For application assistance please contact CMP Specialty Products at 215 540 8100.